Everest Energy, a sanctioned Russian liquefied natural gas (LNG) vessel, is heading to a as-yet-unfinished gas facility in northern Russia to pick up what will be the fourth cargo of LNG to be loaded from the terminal.

The vessel was placed under sanctions earlier this year, and the entire Arctic LNG 2 facility was reportedly placed under US sanctions last year.

Multiple media outlets have reported both the movement of the vessel and the placement of gas by Novatek onto a floating production storage and offloading (FPSO) facility is an attempt to circumnavigate the sanction.

The Arctic LNG 2 project is 60% owned by Novatek and is set to eventually become Russia’s largest LNG plant.

The wide-ranging US sanctions on Russia have seemingly dissuaded many buyers that were considering making purchases from the facility.

The expansion of the project has been delayed until 2028, as the sanctions continue to bite.

Over the past year, Russia has been developing a so-called ‘shadow fleet‘ of oil and gas cargo vessels to move and sell its hydrocarbons, even while under sanctions.

On Thursday, the US imposed further sanctions on two companies linked to Russia’s new LNG project, with Gotik Energy Shipping and Plio Energy Cargo Shipping now under restrictions.

“Sanctioned Russian tanker heading to new LNG facility to pick up load” was originally created and published by Offshore Technology, a GlobalData owned brand.

 


The information on this site has been included in good faith for general informational purposes only. It is not intended to amount to advice on which you should rely, and we give no representation, warranty or guarantee, whether express or implied as to its accuracy or completeness. You must obtain professional or specialist advice before taking, or refraining from, any action on the basis of the content on our site.



Source link